
Valve Tags
Engraved valve tags for mechanical rooms, pipe systems, utilities, process equipment, and facility maintenance. Produced from your valve schedule and organized for installation.
What are valve tags?
Valve tags are engraved tags that identify one valve from the approved valve schedule: valve ID, system or service, location, quantity, material, size, and attachment. Add normal position only when the facility requires it. CPL engraves the schedule you approve. Cables and general equipment markers belong on the engraved phenolic tags page. Most quotes go out within one business day. Standard production time is 3 to 5 business days.
Does ASME A13.1 specify every valve tag?
ASME A13.1 concerns identification of piping systems. Do not treat it as a universal valve-numbering or tag-content specification. Check the adopted piping standard alongside the facility's valve schedule and project requirements, and confirm any color, text, or placement rules with the responsible designer.
Should valve tags include a normal-open or normal-closed position?
Include a normal-position field only when the approved facility schedule or project standard calls for it. Do not infer operating positions from photographs or from a similar valve. Use approved abbreviations consistently, and have operations or the designer check the source list before engraving.
How do I organize valve tags for installation?
Give each tag a unique ID and add building, floor, room, system, or installation-sequence columns to the schedule. State the desired grouping with the quote request. Confirm attachment hardware and packaging details before production so the installed tag matches both the valve and the maintenance records.
Download the label ordering template
CSV label schedule · Excel label schedule (ZIP)
Keep one row per distinct label design and use the quantity column for repeats. Unzip the Excel file to access instructions, a blank order sheet, and clearly marked examples. Replace example wording with your approved project data, preserve leading zeros, and confirm the source revision before uploading.
Valve tag standards · Engraved phenolic tags · Equipment nameplates
Custom Phenolic Labels produces engraved valve tags for facility managers, mechanical contractors, industrial plants, schools, hospitals, and building operators. Send a valve schedule, pipe list, system map, spreadsheet, or existing tag photos and the production team will quote tags by system, zone, floor, or installation sequence.
What Are Valve Tags?
A valve tag identifies an individual valve against the approved facility schedule. Supply the exact valve number, system or service and any other wording required by the project. Confirm the tag dimensions, material, colors, hole details and attachment for the installation. Include operating-position information only when it is present in the approved records; engraving does not verify how the valve should be operated.
Refinery, petrochemical and oil/gas valve tags
Send the approved process or utility valve schedule with the current drawing or P&ID reference. Keep the exact valve identifier and service separate from unit, area or installation-group fields. Identify revised equipment or valve numbers so an earlier order does not become the source for obsolete wording. For related pumps, motors and other fixed assets, use the equipment nameplate service with authoritative equipment data.
Describe the normal and peak temperatures, sunlight, moisture, chemical names and concentrations, cleaning process and attachment conditions. Send any specified substrate or manufacturer grade unchanged for review. Confirm the proposed stock and relevant documentation before release; an engraving laminate trade name does not establish suitability for corrosive, high-heat or other specialist exposure. For Texas project receiving details, see Houston engraved identification, Midland equipment labels and Corpus Christi project labels.
Water and wastewater treatment identification
Prepare the plant-approved valve and equipment identifiers with the current schedule revision. Define the exact text, quantities, sizes, colors, material and attachment requirements for each design. Add building, treatment area, system or phase fields for requested grouping. Keep valve identifiers and equipment plates separate from the pipe-marker requirements approved by the responsible project team.
Identify wet, outdoor, washdown and chemical-cleaning conditions for the actual mounting location. Confirm the stock and attachment documentation instead of assuming every tag material suits every treatment process. The material and exposure guide and approved schedule checklist explain the information to supply. CPL reproduces the approved identification; the project team supplies operating positions, technical information and the governing marking requirements.
Valve tag formats we produce
Each tag can be cut, engraved, drilled, chained, and grouped to match the schedule.

Numbered valve tags
Sequential valve numbers, system IDs, and location codes engraved from schedules or spreadsheets.

Color-coded systems
Tags grouped by system, service, building, floor, or zone with color choices confirmed at quoting.

Chain and hole options
Chain holes, tie holes, drilled mounting holes, or custom attachment layouts for field conditions.

Facility packages
Large valve-tag sets packaged by mechanical room, riser, floor, system, or installation phase.
Problems valve tags solve
Missing or ambiguous valve identifiers
Use the current approved valve number and service information so the installed tag can be checked against the facility records. Resolve missing or conflicting identifiers before production.
Schedules that do not match the field
Tags produced from the active schedule help align the physical system with facility documentation.
Material unsuitable for the exposure
Provide heat, sunlight, moisture and chemical conditions for review of the actual stock and attachment. Engraving does not make every material suitable for every installation.
Slow installation
Grouped packaging lets installers pull tags by system or room instead of sorting a mixed box onsite.
How valve tag orders move through production
The source valve schedule drives the order.
Send the valve schedule. Upload a spreadsheet, PDF, pipe list, drawing, or photo set.
Confirm the tag format. We confirm shape, size, color, hole, chain, material, quantity, and sequence.
Review proof details. Complex or large sets can be proofed before engraving.
Engrave and drill. Tags are cut, engraved, drilled, and inspected in-house.
Sort the package. Finished tags can be grouped by system, room, floor, or installation sequence.
Ship nationwide. Orders ship from Kennesaw, Georgia, with the 3 to 5 business day production schedule confirmed before production.
Why engraved valve tags work
Material selected for the installation
Confirm the proposed stock and mounting for the actual exposure. Inspect identification during maintenance and replace damaged or unreadable tags; service life depends on the material, installation and environment.
Matches the schedule
Tags can be produced directly from your valve schedule or asset list.
Organized for installation
Large orders can ship sorted by system, floor, room, or installation phase.
Why Custom Phenolic Labels
In-house engraving in Kennesaw
Our engraving operation is part of Mike’s Trophies & Awards, established in 1987. Valve tags are produced in-house in Kennesaw, Georgia and shipped nationwide.
Schedule-driven production
Valve schedules, equipment lists, and spreadsheets can become the production file.
Facility-scale orders
Single replacement tags and full building valve-tag packages are both supported.
Nationwide shipping
Ship to contractors, warehouses, and active facilities across the United States.
Rush support
Standard production time is 3 to 5 business days.
Quote and ordering details for valve tags
For valve tag pricing, send the valve schedule, pipe list, system map, asset list, spreadsheet, drawing, or clear photos. Include tag number, service, location, system, color, tag size, hole or chain requirement, and any grouping needed for installation.
Cost depends on tag size, material, color pair, engraving complexity, hole or chain configuration, quantity, and sorting requirements. A structured valve schedule produces the most accurate quote because the tag text and sequence can move directly into the engraving workflow.
Valve tag pricing
Valve tag pricing depends on tag size, shape, material, color pair, hole or chain configuration, engraving complexity, quantity and sorting requirements. Send the complete approved schedule and physical specifications so the quote covers the actual order.
Quote valve tags
Send your valve schedule, pipe list, drawing, or photo set and we will confirm the tag package.
Request a QuoteCommon questions
Valve tags are durable identification tags attached to valves so maintenance teams can identify the valve number, system, location, service, and shutoff function.
Yes. Send the valve schedule, spreadsheet, pipe list, drawing, or existing tag photos. Structured files help prevent retyping and make it easier to sort tags by system or location.
Common options include engraved phenolic or lamacoid-style plastic for durable facility identification. Material is confirmed during quoting based on the environment, attachment method, and project specification.
Yes. Valve tags can include chain holes, tie holes, drilled mounting holes, or custom attachment layouts. Chains or attachment hardware can be quoted when required.
Yes. Valve tags can be grouped or color-coded by water, steam, gas, HVAC, process, fire protection, or other facility systems when the schedule provides the system assignments.
Cost depends on size, material, color pair, quantity, hole or chain configuration, engraving complexity, and sorting requirements. Send the valve schedule for an itemized quote.
Use the valve-identification requirements approved for your facility or project. Send the controlling specification and revision with the exact valve IDs, wording, dimensions, material, colors and attachment details. Keep pipe-marker requirements separate from the valve-tag schedule, and have the responsible project team confirm any applicable standard or color convention. CPL reproduces the supplied identification; engraving alone does not establish compliance for the installation.
Yes. Finished tags can be grouped by building, floor, mechanical room, system, zone, riser, or installation sequence.
Most quote requests are answered within one business day. Standard production time is 3 to 5 business days.
Explore more
Valve Tags by metro:
Other engraved services:
Get a Fast Quote
Send your specs, label list, or panel schedule. Most quotes go out within one business day. Standard production time is 3 to 5 business days.
Kennesaw, GA 30144
Mon–Thu 9:30–4:30 · Fri 9:30–2:30